Sc200 CE Facade Exterior Passenger Hoist & Building Material Lift
Construction lift is also called building construction elevator, construction hoist, passenger hoist, pm hoist, building lift. It is widely used as construction machinery to lift people and building materials. SC series Construction Hoist/Elevators adopts rack-and-pinion transmission.
The equipment is applicable to people and material transporting at exterior or interior of high buildings, such as bridges, chimneys, mansions, etc. And can also be used in warehouse, elevator shaft, pit, etc for vertical transportation.
| Characteristic | Model | Rated Loading | Lifting Speed | Motor Power |
|---|---|---|---|---|
| Double cages | SC200/200 | 2x2000kg | 33m/min | 2x(3x11kw) |
| SC150/150 | 2x1500kg | 33m/min | 2x(2x13kw) | |
| SC100/100 | 2x1000kg | 33m/min | 2x(2x11kw) | |
| Single cage | SC200 | 2000kg | 33m/min | 3x11kw |
| SC150 | 1500kg | 33m/min | 2x13kw | |
| SC100 | 1000kg | 33m/min | 2x11kw |
With nearly 20 years of experience, we utilize high-quality raw materials and advanced welding methods to ensure accurate dimensions and strong structures. Our products have been exported to more than 50 countries and regions worldwide.
Certified as a Special Equipment production manufacturer with ISO9001, ISO14001, CE, and EAC approvals.
Our hoists are widely used for vertical transportation of people and materials in high-rise buildings, bridges, chimneys, and internal elevator shafts.
Yes, we provide OEM services. The dimensions (Length, Width, Height) and mast section colors can be arranged according to the client's specific building design.
Standard safety features include an anti-falling governor (SAJ40-1.2), mechanical and electrical interlocks, overload protectors, and emergency stop systems.
The standard production period is approximately 7-10 days, with shipping times depending on the destination port.
Our construction elevators are fully certified with CE, EAC, ISO9001, ISO14001, and ISO45001 standards.
Please provide the required lifting height (m), load capacity (tons), whether you need a single or double cage, and your local power supply specifications (kV, Hz).